PROJECT Acronym |
EALING |
PROGRAMME |
CEF PROGRAMME https://ec.europa.eu/inea/en/connecting-europe-facility/cef-transport |
FULL TITLE |
European flagship action for cold ironing in ports |
DURATION |
1/6/2020 – 31/12/2022 |
PROJECT TOTAL BUDGET |
€ 6.960.240 |
PPA SA BUDGET |
€ 190.300 |
FUNDING |
50% EU contribution |
PROJECT SUMMARY |
In the context of the new European Green Deal aiming to prepare the transition to zero greenhouse gas emissions as transport represents 25% of the emission in the European Union, the electrification of the maritime transport is a key challenge to move towards a more competitive and sustainable TEN-T Maritime Network in the future. In line with this framework EALING expresses the needs to accelerate the effective deployment of OPS solutions in the EU maritime ports proposing a concrete approach towards the establishment of a suitable framework for the transition to electrification for 16 EU maritime ports involved in the EALING consortium in different sea basins, that decided to adapt to the new regime of alternative fuels utilization in the maritime sector: Mediterranean Sea (Valencia, Barcelona, Ancona, Trieste, Monfalcone, Venice, Piraeus, Rafina and Koper), Black Sea (Constanta, Varna and Burgas), Atlantic Sea (Gijon, Huelva, Leixoes and Azores) and North Sea (North Sea Irish ports via the Irish Maritime Development office). |
PROJECT AIMS |
EALING aims at implementing the following specific objectives: |
PPA SA ROLE |
In the frame of EALING, PPA SA will implement all studies to prepare and accelerate the effective launch of cold ironing and electric bunkering equipment within port area. Additionally, PPA SA, as a core port of Europe, will contribute into the development of a common EU harmonised and interoperable framework for deployment of OPS infrastructure and equipment in the ports with close cooperation between all the stakeholders of the maritime sector. |
PARTNERS |
• Valenciaport (ES) |